Description
⭐ All accessories are priced at AUD 5.99 per meter
| 📦 SERIES | 🔧 NAME | 🛠 MATERIAL | 📏 LENGTH (mm) | 🎨 COLOR | 📦 PAG (PCS) |
|---|---|---|---|---|---|
| 1 OUTSIDE CORNER |
OUTSIDE CORNER | STEEL | 3000 | SAME COLOR | 16 |
| OUTSIDE CORNER BASE | ALUMINUM | 3000 | SILVER | 8 | |
| EXTERIOR CORNER CAP | STEEL | 3000 | SAME COLOR | 40 | |
| OUTSIDE CORNER | STEEL | 3000 | SAME COLOR | 4 | |
| 2 CONNECTING BAR |
CONNECTING BAR | STEEL | 3000 | SAME COLOR | 30 |
| CONNECTING BAR BASE | ALUMINUM | 3000 | SILVER | 60 | |
| 3 J-CHANNEL |
J-CHANNEL | STEEL | 3000 | SAME COLOR | 16 |
| 4 INSIDE CORNER |
INSIDE CORNER | STEEL | 3000 | SAME COLOR | 16 |
| INSIDE CORNER | STEEL | 3000 | SAME COLOR | 60 | |
| INSIDE CORNER | STEEL | 3000 | SAME COLOR | 10 | |
| 5 WINDOW & DOOR |
WINDOW & DOOR J-CHANNEL | STEEL | 3000 | SAME COLOR | 16 |
| WINDOW & DOOR CORNER COVER | STEEL | 70 × 70 | SAME COLOR | / | |
| WINDOW SLEEVE / WINDOW FRAME | STEEL | 3000 | BLACK / WHITE | 10 | |
| 6 OTHER |
BOTTOM FLASHING | STEEL | CUSTOMIZE | BROWN | 20 |
| STARTER STRIP | ALUMINUM | 3000 | SILVER | 60 |
🛠️ How to Install Thermal Metal Siding Panels with Decorative Finishes
📘 Table of Contents
🧰 Tools and Materials Needed
- Measuring tape and chalk line
- Spirit level and plumb line
- Circular saw with metal/PU cutting blade or hand shears
- Screw gun or drill driver
- Self-tapping screws with sealing washers
- Starter strips and corner trims (metal profiles)
- Sealant tape or PU foam (optional)
- Safety gear (gloves, goggles, helmet)
1 🔨 Prepare the Wall Surface
- Check wall flatness and ensure the substrate is level.
- Install vertical battens or steel furring strips as needed (400–600 mm spacing).
- Install a perfectly level starter strip at the bottom to align the first row of panels.
2 ✂️ Panel Layout and Cutting
- Measure wall dimensions to determine panel quantities and necessary cuts.
- Cut panels using a circular saw with a fine-tooth metal/PU blade. Avoid angle grinders.
- Always cut panels from the backside to protect the decorative surface.
3 📐 Installing the First Panel
- Place the female edge of the first panel onto the starter strip.
- Ensure the panel is vertically plumb and aligned.
- Fix using self-tapping screws with sealing washers.
- Do not overtighten screws to avoid panel distortion.
4 🔧 Interlocking Subsequent Panels
- Insert the female joint of the new panel into the male groove of the installed panel.
- Gently tap with a rubber mallet if necessary.
- Fix each panel to the substructure at recommended intervals (600–800 mm).
- Progress across the wall from bottom to top and corner to corner.
5 🔗 Corner Treatment and Trims
- Outside corners: Use pre-fabricated corner trims matching panel finish.
- Inside corners: Use dedicated inside corner profiles or angle trims.
- Window and door openings: Install J-trims or U-profiles.
- Top edge: Install cap trim or flashing for waterproofing.
6 🛡️ Sealing and Thermal Performance (Optional)
- Apply sealant tape or PU foam in high wind/rain areas.
- Seal around window frames and penetrations properly.
7 ✔️ Final Inspection
- Check that all panels are securely fastened.
- Verify horizontal and vertical alignment.
- Inspect trims and flashings.
- Clean the panel surfaces of dust and debris.
⭐ Advantages
- Superior insulation with 16 mm PU core
- Decorative options: brick, stone, wood imitation
- Durable 0.25 mm Alu-zinc coated steel
- Fast interlocking installation
- Low maintenance finish
🏢 Common Applications
- Residential homes
- Commercial buildings (showrooms, retail)
- Industrial warehouses and prefabricated offices
- Renovation projects requiring insulation + decorative finish
Additional Information
| Accessories |
OutsideCorner 1, OutsideCorner 2, OutsideCorner Cap, Outside Corner Base, Connecting Bar, Connecting Bar Base, inside corner, inside corner 2, Window& Door J-Channel, Window&Door Corner Cover, Window Frame, Bottom Flashing, Starting Strip |
|---|
Accessories
$5.99
